Selected work

The work matters. So does the thinking behind it.

These are verified projects — real photographs, real scopes, real outcomes. No renderings, no stock photography.

Case study — residential renovation

Whole House on a Working Budget

A 1957 brick ranch, a disciplined scope, and a budget put where it could do the most good.

Type
Whole-house renovation
Structure
1957 brick ranch
Scope
Interior renovation, egress, lower level
Approach
Budget-first planning

The house had good bones and a long list of deferred maintenance. The owners needed a realistic plan that addressed the most important work first, preserved what was worth keeping, and stayed within a defined budget.

Black Cloud developed the scope, established priorities, coordinated the trades, and managed the project from planning through completion. The original hardwood floors were refinished rather than replaced. The lower level was cleaned up and made functional. The bathroom was fully renovated. The fireplace surround was repaired and painted. Flooring was updated throughout the main level.

The result was a house that felt finished and cared for — without spending money on things that did not need to be done.

The scope was defined before the budget was committed. That order matters.

Most renovation overruns begin with an incomplete scope, not an unrealistic budget.

Project photographs

Existing brick fireplace surround with deteriorating plaster crown molding before renovation
Existing fireplace — plaster crown failingBefore
Original bedroom with hardwood floors, beige walls, and ceiling fan before renovation
Original hardwood bedroom — preservedBefore
Bathroom interior during selective demolition — original pink tile and wallpaper removed
Selective demolition — bathroomDuring
Bedroom during preparation — carpet pulled back, painter's tape on window trim, ready for refinishing
Bedroom prep — floors staged for refinishingDuring
Preserved kitchen with oak cabinets, LVP flooring, peninsula, and white appliances — functional, not renovated
Kitchen — preserved and functionalDuring
Finished living room with new LVP flooring, painted fireplace surround, and large picture window
Finished living roomAfter
Finished lower level with painted epoxy floor, white walls, and exposed mechanical ceiling
Finished lower levelAfter
Finished bathroom with dark tile shower, white vanity, bronze fixtures, and industrial lighting
Finished bathroomAfter
Finished shower with large-format dark slate tile and oil-rubbed bronze valve trim
Finished shower — slate tileAfter

Case study — basement finishing

A Basement the Whole Family Could Claim

An unfinished lower level planned around gathering, privacy, egress, a bathroom, and useful storage.

Type
Basement finishing
Scope
Full lower-level build-out
Features
Egress, bathroom, bar, game room
Approach
Family-use planning

The basement was unfinished and underused. The family wanted a space that could serve multiple purposes — a place to gather, a game room, a bar area, private space for guests, a bathroom, and organized storage — without the lower level feeling like an afterthought.

Black Cloud planned the layout, coordinated the egress window installation, managed the framing, plumbing, electrical, and finish work, and kept the project on schedule through each phase. The egress window added light and code-compliant emergency exit. The bathroom was built from scratch. The bar and game room were designed around how the family actually uses the space.

A basement that works for a family looks different than one that works for resale.

Planning around actual use — not a generic finish package — is what makes the difference.

Project photographs

Unfinished basement before renovation — exposed joists, HVAC ductwork, painted concrete floor
Unfinished lower level — before work beganBefore
Egress window excavation in progress — worker installing drainage at foundation wall
Egress window excavationDuring
Basement framing layout during construction — stud walls and beam structure visible
Framing layoutDuring
Bar area under construction — dark cabinet framing, columns, and tile floor in progress
Bar area — framing and tile in progressDuring
Finished basement game room with LVP flooring, recessed lighting, and open layout
Finished game roomAfter
Finished basement built-in fireplace with tile surround and custom millwork
Built-in fireplace — finishedAfter
Completed custom bar with dark cabinetry, pendant lighting, and bar seating
Completed custom barAfter
Finished basement bathroom with tile shower, vanity, and modern fixtures
Finished bathroomAfter
Finished basement privacy door — solid-core door with trim, providing separation between spaces
Privacy door — guest space separationAfter
Finished organized storage area in basement — built-in shelving and utility space
Organized storageAfter

Additional case studies

Selected projects

Timber covered deck with a gabled roof and railings beside a house in a wooded setting.
A covered deck shaped around the customer's wooded property and mountain-lodge brief.

Exterior Construction

A Lodge-Style Deck in a Wooded Setting

The customer wanted the feeling of a mountain lodge on a heavily wooded property. The covered deck was developed around that setting, with cedar beams, a sheltered gathering space and a textured roof underside. Material choices and details were considered together to support the character the customer wanted.

Timber range hood above a pot filler and decorative tile panel between white kitchen cabinets.
Saved decorative tile became the feature behind the pot filler. Hood and shelving by a local craftsman.

Interior Construction

A Kitchen Refresh Built Around Reuse

This kitchen refresh began with the owner's wish to reuse as much as possible. Two cabinets were added alongside a new backsplash, paint, shiplap and a pot filler. Decorative tile left from her daughter's project became a feature around the pot filler. A new French door and a custom pantry extending into the garage were also part of the work. A local craftsman made the distressed hood and shelving.

Glass shower enclosure with large pale wall tiles, a tiled floor and warm metallic shower fittings.
The finished shower from a bathroom planned around the client's preferred look and a practical scope for the home.

Interior Construction

A Bathroom Shaped Around the Client

The client had a clear idea of the bathroom she wanted, but the first quoted approach was beyond her budget and what made sense for the home. We worked from her preferences to develop a more practical scope, including custom cabinetry, a smart mirror and gold fixtures. The finished room followed the look she valued, with the work considered against the house and budget.

Start a conversation

Have a project that needs this kind of attention?

Tell us what is happening. We will tell you whether a conversation makes sense.

Discuss Your Project